CQUniversity Unit Profile

In Progress

Please note that this Unit Profile is still in progress. The content below is subject to change.
ENRP20003 Engineering Research Project Implementation
Engineering Research Project Implementation
All details in this unit profile for ENRP20003 have been officially approved by CQUniversity and represent a learning partnership between the University and you (our student).
The information will not be changed unless absolutely necessary and any change will be clearly indicated by an approved correction included in the profile.
General Information

Overview

This unit is designed so that students can complete an investigative study through the analysis of, reflection on and critique of, an area of their professional practice that was commenced in Engineering Research Project Planning. By completing this project, students will contribute to the body of knowledge for their discipline. Students will present their project in a thesis and a professional presentation.

Details

Career Level: Postgraduate
Unit Level: Level 9
Credit Points: 12
Student Contribution Band: 8
Fraction of Full-Time Student Load: 0.25

Pre-requisites or Co-requisites

Prerequisite: ENRP20001 Engineering Research Project Planning

Important note: Students enrolled in a subsequent unit who failed their pre-requisite unit, should drop the subsequent unit before the census date or within 10 working days of Fail grade notification. Students who do not drop the unit in this timeframe cannot later drop the unit without academic and financial liability. See details in the Assessment Policy and Procedure (Higher Education Coursework).

Offerings For Term 1 - 2025

Melbourne
Online
Perth
Rockhampton

Attendance Requirements

All on-campus students are expected to attend scheduled classes – in some units, these classes are identified as a mandatory (pass/fail) component and attendance is compulsory. International students, on a student visa, must maintain a full time study load and meet both attendance and academic progress requirements in each study period (satisfactory attendance for International students is defined as maintaining at least an 80% attendance record).

Class and Assessment Overview

Information for Class and Assessment Overview has not been released yet.

This information will be available on Monday 13 January 2025
Previous Student Feedback

Feedback, Recommendations and Responses

Every unit is reviewed for enhancement each year. At the most recent review, the following staff and student feedback items were identified and recommendations were made.

Feedback from SUTE

Feedback

Availability of the software and their license renewal

Recommendation

The students and supervisors should work with the Unit Coordinator and Lab Manager to ensure software access and availability for project implementation prior to the start of the term.

Feedback from SUTE

Feedback

Simulation lab access

Recommendation

The Unit Coordinator should arrange access to the simulation lab for all the project students with DFM from the beginning of the Term.

Unit Learning Outcomes

Information for Unit Learning Outcomes has not been released yet.

This information will be available on Monday 13 January 2025
Alignment of Learning Outcomes, Assessment and Graduate Attributes

Information for Alignment of Learning Outcomes, Assessment and Graduate Attributes has not been released yet.

This information will be available on Monday 13 January 2025
Textbooks and Resources

Information for Textbooks and Resources has not been released yet.

This information will be available on Monday 17 February 2025
Academic Integrity Statement

Information for Academic Integrity Statement has not been released yet.

This unit profile has not yet been finalised.